As Iñaki Ábalos explains in his article Bartleby, the Architect (El País, 10 March 2007), sometimes the best decision in a project is to do nothing. Advocating restraint when architecture seems locked in a contest for formal virtuosity increasingly detached from reality is, at the very least, risky. In a refurbishment, defining the limits between intervention and non-intervention is even more important.
The intervention is conceived as a form of acupuncture: doing little, quickly and precisely.
Little, because the industrial typology of the warehouses can accommodate the proposed activities without major alterations; quickly, because the city’s artistic community faces a shortage of suitable locations and needs effective responses in a short time; and precisely, because making efficient use of resources is essential to the project’s viability.
The project focuses on two areas: providing the buildings with the necessary infrastructure, and giving the complex formal unity and coherence to create a representative place.
The buildings are activated by inserting two large “engines” — functional cores — containing all the services required for the facility to operate. These cores also play an active role in shaping the proposal’s spatial configuration.
This arrangement of functional bands becomes the starting point for the formal character of the complex. The proposal draws on the site’s etymological and historical roots, reinterpreting the concept and meaning of tartan, the characteristic woven fabric of Scottish culture. The functional scheme creates a new centre: a flexible-use space directly connected to the new courtyard square within the block.